Flooding on the Kaskaskia River in Modoc, IL
Here are some great before and after pictures of the US Army Corps of Engineer, Kaskaskia River Project building in Modoc, IL. After the record setting heavy rain we had in June, they had close to 6 inches of standing water, which had saturated all of the exterior walls. Wet insulation removal is most important in a water loss to prevent mold. The after picture is taken a few short days after the loss. Thanks to our quick response we were able to get the effected walls out and the drying process. Getting them up and running quickly was the most important part of this job!